Why material reuse should begin long before the furniture is specified.
Every refurbishment begins with an opportunity. Before the new finishes are selected, the furniture specified or the contractors arrive on site, a building already contains an inventory of materials, many of which have the potential for another life.
Yet all too often, those materials disappear long before anyone has considered what they could become.
We regularly speak to architects and interior designers towards the end of a project, when the conversation turns to furniture, surfaces and objects made from recycled materials. By this stage, the strip out has often been completed, the construction waste removed and the opportunity to work with materials from the building itself has passed.
What if we started thinking about the materials we’re removing with the same consideration as those we’re bringing in?
The disconnect between demolition and design
Construction and interior design programmes don’t always align when it comes to material reuse.
Strip out and demolition often happen early, while furniture, fixtures and equipment are developed and procured much later. By the time designers are considering bespoke pieces, the materials that could have been used to create them may already have left the site.
These materials have value beyond their environmental or emotional significance.
Removing construction waste has a commercial cost. Materials need to be handled, transported and processed, with disposal or recovery charges often involved. Once removed, there may also be a cost associated with sourcing new materials for the finished interior.
Reusing construction waste isn’t automatically cheaper. Recovery, storage, processing and remanufacturing all carry costs. But identifying opportunities early allows project teams to consider whether some of that value can be retained.
For our project with Harrison, the architects approached us before demolition began. Conversations started around 18 months before an order was placed, giving us time to explore how materials from the construction site could become part of the finished interior.
The result was a bespoke reception desk incorporating 400kg of construction waste, including brickwork dating back to 1881.
The opportunity existed because the conversation happened early enough.
Start with a material inventory
One of the most useful things a project team can do before strip out is understand what already exists.
What is being removed? What could remain in place? What might be suitable for direct reuse, and what could be transformed into something entirely different?
A material inventory can begin with a site visit, photographs, quantities and an understanding of the proposed works.
Existing joinery, furniture, timber, stone, tiles, brickwork and architectural elements may all offer opportunities. Some materials might be retained or refurbished, while others could become ingredients for new surfaces, furniture or objects.
We offer early stage material audits to help architects, designers and project teams identify these possibilities. Through a site visit and assessment, we can explore what is available, which materials are worth investigating and how they might be incorporated into the project.
The earlier this happens, the more possibilities there are.
Not everything is worth saving
An effective material audit isn’t about keeping everything.
Some materials may be unsuitable because of their condition, composition, contamination or the practicalities of recovery. Others may be technically suitable but difficult to store, transport or process within the project’s budget and programme.
The question isn’t simply what can be saved, but what is worth saving and why.
Sometimes the most responsible decision is to retain an existing element rather than manufacture something new. Sometimes a material can be reused in its original form. And sometimes there is an opportunity to transform it into something with a completely different purpose.
The aim is to make informed decisions before those options disappear.
Give materials a destination before they’re removed
Identifying materials is only part of the process. The next step is imagining what they could become.
Could brick and rubble from demolition become a reception desk? Could existing timber find a new purpose in furniture? Could surplus materials be incorporated into decorative surfaces or objects?
When these questions are asked early, material recovery can become part of the design process rather than a separate waste management exercise.
But not every waste stream requires the same lead time.
Construction waste is often a finite resource. Once a building has been stripped out, those particular materials may no longer be available.
Other waste streams are ongoing and can offer more flexibility.
For our project at Tate Modern’s Corner Café, we worked with used coffee grounds, a byproduct generated through everyday operation, incorporating them into bespoke tables and cake stands.
Similarly, our work with Kia explored leather waste generated through the company’s regular production processes.
Unlike materials recovered during demolition, these waste streams aren’t necessarily dependent on a single recovery window. They can offer opportunities for material development at different stages of a project.
Understanding where waste comes from, and when it’s available, is an important part of deciding how and when to incorporate it.
Making reuse part of the project programme
For refurbishment projects, the greatest opportunities often emerge when material reuse is considered early.
A simple sequence can help project teams identify where those decisions need to happen.These stages may overlap, but the important thing is allowing sufficient time to explore the opportunities.
Recognising the value of what we already have
There’s an understandable tendency to think about recycled materials when we begin specifying new products.
But in refurbishment projects, some of the most valuable resources may already be sitting within the building.
They represent materials that have already been extracted, manufactured, transported and installed. By considering their potential before demolition begins, architects and interior designers can create opportunities to retain that value through direct reuse, adaptation or entirely new applications.
Not every material will be suitable, and not every project will have the space, time or budget to recover everything. But identifying even a small number of meaningful opportunities can change how we approach a refurbishment.
Because sometimes the most interesting materials for a new interior are the ones we were about to throw away.